For Architects & Engineers

Solar for Architects, Engineers, and Construction Managers

Solar is a building system. We help you design it in, size it correctly, place its equipment, and document its compliance so it never comes back as a plan check comment or a redesign.

Architects inherit the solar requirement whether or not a solar contractor has been selected. The roof plan has to carry the required array, the electrical rooms have to hold the inverters and the battery, the structure has to carry the loads, and the compliance forms have to agree with the energy model. When that work happens without a solar partner, it happens twice.

Eventure works alongside architects, electrical and structural engineers, energy consultants, and construction managers as the solar member of the design team: we provide the calculation, the layout, the equipment data, and the coordination so the solar system is designed with the building rather than onto it.

What you get

A solar partner who attends the coordination meetings, owns the scope from the Energy Code calculation to permission to operate, and keeps solar off the critical path to your Certificate of Occupancy.

What Matters to You

Six things we deliver on every project.

01

Early sizing you can design to

We provide the Energy Code PV and battery calculation at schematic design, with the Solar Access Roof Area analysis, so the roof plan is designed to the number rather than checked against it later.

02

Roof layouts and aesthetics

Array zones, module orientation, fire access pathways, and equipment screening are laid out with you so the roof reads as designed from the street and from above.

03

Equipment placement

Inverters, batteries, disconnects, and metering get locations, clearances, and ventilation worked out with the electrical engineer and the fire authority before the plan set is issued.

04

Structural coordination

Array dead loads, canopy columns, and attachment points are provided to the structural engineer at the right time.

05

Compliance documentation

We coordinate with the energy consultant so the compliance forms, the energy model, and the installed system match, and the Certificate of Installation is ready at closeout.

06

Plan check and redesign avoidance

Solar and storage submittals are prepared to move through plan check with the building permit, not behind it.

Phase by Phase

What we do, and when.

Project phaseEventure's work
Schematic designEnergy Code calculation, SARA analysis, preliminary array zones, battery and inverter space needs
Design developmentArray layout, roof coordination with mechanical, fire pathways, structural loads, electrical room layout
Construction documentsFinal drawings and specifications, single-line coordination, compliance forms with the energy consultant
Plan checkResponses to solar, electrical, and fire comments; revisions coordinated with the set
Construction administrationSubmittal review support, RFIs, field coordination, inspection documentation
CloseoutCertificate of Installation, as-builts, monitoring and O&M documentation for the owner

The Process

Concept to closeout.

Concept

Preliminary sizing, roof and parking strategy, utility territory, budget range.

Design

Energy Code calculation, Solar Access Roof Area analysis, array zones, equipment space.

Engineering

Structural loads, electrical single-line, battery location, fire pathways, single point of coordination.

Title 24 Coordination

Compliance forms aligned with the energy model; PV and battery documented for plan check.

Permitting

Solar and storage submittals move with the building permit; plan check comments closed in one cycle.

Procurement

Modules, inverters, racking, and batteries ordered against the construction schedule with lead times tracked.

Installation

Rough-in with the electrical sub, attachments with the roofer, array and equipment set on sequence.

Utility Coordination

Interconnection application filed during design; metering, witness tests, and permission to operate pursued in parallel.

Inspection

Attachment, electrical, and fire inspections scheduled against milestones; Certificate of Installation completed.

Commissioning

Performance verification, monitoring activated, controls and battery settings confirmed.

Project Closeout

Permission to operate, as-builts, warranties, O&M documentation, and turnover before the Certificate of Occupancy.

Full process detail   Building types we serve

Questions

Frequently Asked Questions

Can Eventure provide the Title 24 PV and battery calculation during schematics?

Yes. We prepare the Section 140.10 or Section 170.2 calculation, including the Solar Access Roof Area analysis and the floor-area method, and coordinate it with the project's energy consultant.

How do you handle aesthetics?

Array placement, module selection, mounting profile, and equipment screening are design decisions we make with you. Where the roof cannot carry the requirement cleanly, carports and secondary structures are often the better answer.

Do you coordinate with the structural and electrical engineers?

Yes. We provide loads, attachment details, equipment data, and single-line input at the stage each engineer needs it.

What happens at plan check?

We respond to solar, electrical, and fire comments on the solar scope and coordinate revisions with your set so the comments close in one cycle.

Get Eventure Involved Early

Discuss your project with a new construction solar specialist.

Send us a massing study, a schematic set, or a permit set. We will review the Title 24 requirement, the roof, the electrical approach, and the schedule, and tell you what needs to happen and when.