Technology & Infrastructure / California
Solar for New Telecommunications Facilities
Telecommunications buildings exist to stay on. Solar and storage at a switching center or network hub serve resilience first and operating cost second, and they must be engineered to sit alongside existing DC plant, generators, and transfer systems without creating a new point of failure.
Eventure's Role
Eventure works with carriers, infrastructure developers, and their engineers to plan solar and storage at telecom facilities with reliability as the governing requirement.
We bring solar into the project at schematic design, size the Energy Code requirement, coordinate the roof, structure, electrical rooms, and battery location with your architect and engineers, and carry the system through permitting, utility interconnection, inspection, commissioning, and closeout.
Title 24 treatment
Telecommunications facilities are evaluated by occupancy mix and conditioning. Office portions are listed occupancies under Section 140.10; equipment areas may be treated as covered processes. We confirm the applicable requirements during design.
Design Considerations
What is different about telecommunications.
- Resilience architectureStorage designed around the facility's critical loads and transfer scheme adds runtime without interfering with existing backup systems.
- Small roofs, ground mounts, and canopiesMany telecom sites have limited roof area. Ground-mounted arrays and canopies over equipment yards or parking can provide capacity.
- Security and accessEquipment placement respects site security, fencing, and access control requirements.
- ClassificationTelecom buildings combine equipment space with limited office area. The Energy Code analysis depends on the occupancy mix and conditioning.
Keep Solar Off the Critical Path
Don't let solar be the last thing standing between your project and its Certificate of Occupancy.
On telecommunications projects, as on every California building, the Energy Code requirement, the fire authority's review of the battery, the utility's interconnection timeline, and the building's final inspection all depend on the solar scope being designed, permitted, installed, and documented in sequence. We treat it as a scheduled trade from day one.
Solar and the Certificate of Occupancy
Questions
Telecommunications solar, answered.
Can solar and storage extend backup runtime at a telecom site?
Yes, when integrated with the site's existing backup architecture by the electrical engineer. Storage adds runtime and solar recharges it during extended outages; neither replaces the generator or DC plant.
What if the site has very little roof?
Ground mounts and canopies over yards or parking are common solutions. Where roof area is minimal, the Energy Code's roof-area exceptions may also apply.
Related
More technology & infrastructure building types.
All technology & infrastructure · All building types · Where we work

Discuss Your Project
Planning telecommunications in California?
Send us the drawings at any stage. We will size the Title 24 requirement, review the roof and electrical approach, and map the path to a Certificate of Occupancy that does not wait on solar.