Public buildings carry public expectations: sustainability targets, resilience for essential services, transparent procurement, and prevailing wage. The Energy Code requires solar and storage on most new civic buildings, and agencies typically design beyond the minimum to support emergency operations and climate commitments.

Eventure's Role

Eventure supports public agencies, their program managers, and design-build teams with solar and storage planning for new civic centers, public safety facilities, libraries, and community buildings.

We bring solar into the project at schematic design, size the Energy Code requirement, coordinate the roof, structure, electrical rooms, and battery location with your architect and engineers, and carry the system through permitting, utility interconnection, inspection, commissioning, and closeout.

Title 24 treatment

Libraries, offices, and many civic buildings are listed occupancies under Section 140.10 and must install PV and battery storage. The 2025 Energy Code increased the library PV capacity factor in Climate Zones 2 through 16. Essential facilities are often designed beyond the code minimum for resilience.

Title 24 solar requirements explained

Design Considerations

What is different about government & municipal.

  • Procurement and delivery methodDesign-bid-build, design-build, and lease-leaseback deliveries each place the solar scope differently. We adapt to the agency's method and documentation requirements.
  • Essential facilities and resilienceEmergency operations centers, police and fire facilities, and cooling centers benefit from storage designed to carry critical loads through outages and public safety power shutoffs.
  • Prevailing wage and labor compliancePublic works status brings prevailing wage, certified payroll, and apprenticeship obligations that we build into pricing and staffing.
  • Listed occupanciesLibraries, offices, and community buildings are listed occupancies. Public safety facilities may be classified differently; we confirm each.

Keep Solar Off the Critical Path

Don't let solar be the last thing standing between your project and its Certificate of Occupancy.

On government & municipal projects, as on every California building, the Energy Code requirement, the fire authority's review of the battery, the utility's interconnection timeline, and the building's final inspection all depend on the solar scope being designed, permitted, installed, and documented in sequence. We treat it as a scheduled trade from day one.

Solar and the Certificate of Occupancy
Rooftop solar array being installed on a new mid-rise building during construction

Questions

Government & Municipal solar, answered.

Are new public buildings required to install solar?

Most are. Offices, libraries, schools, and assembly buildings are listed occupancies under Section 140.10 and must install PV and battery storage. Agencies often exceed the minimum to meet climate goals and resilience needs.

Can solar and storage support an emergency operations center?

Yes, when designed with a critical-load panel and controls that coordinate with the facility's generator. Storage extends runtime and solar recharges it during extended outages.

Discuss Your Project

Planning government & municipal in California?

Send us the drawings at any stage. We will size the Title 24 requirement, review the roof and electrical approach, and map the path to a Certificate of Occupancy that does not wait on solar.