Commercial / California

Solar for New Entertainment and Event Venues

Theaters, auditoriums, convention centers, and studios have always been listed occupancies under the Energy Code, and the 2025 code added events and exhibits buildings alongside them. Venues bring large, unobstructed roofs and loads that spike during events, a combination that storage handles well.

Eventure's Role

Eventure works with venue developers, studio operators, and general contractors to plan solar and storage that satisfy the code and smooth the load profile of a building that fills and empties on a schedule.

We bring solar into the project at schematic design, size the Energy Code requirement, coordinate the roof, structure, electrical rooms, and battery location with your architect and engineers, and carry the system through permitting, utility interconnection, inspection, commissioning, and closeout.

Title 24 treatment

Auditoriums, convention centers, and theaters are listed occupancies under Section 140.10, and the 2025 Energy Code added events and exhibits occupancies. Newly constructed buildings in these categories must install PV and battery storage.

Title 24 solar requirements explained

Design Considerations

What is different about entertainment & events.

  • Large clear-span roofsSoundstages and auditoriums offer big, unobstructed roofs. Structural capacity for the array and roof access for maintenance should be in the structural design from the start.
  • Event-driven loadsLighting, HVAC, and production power spike during events. Storage sized beyond the code minimum can clip those peaks and reduce demand charges.
  • Acoustic and vibration constraintsInverter and battery locations should respect acoustic isolation requirements in performance and recording spaces.
  • New 2025 occupanciesEvents and exhibits buildings permitted on or after January 1, 2026 carry PV and battery requirements that earlier code cycles did not impose.

Keep Solar Off the Critical Path

Don't let solar be the last thing standing between your project and its Certificate of Occupancy.

On entertainment & events projects, as on every California building, the Energy Code requirement, the fire authority's review of the battery, the utility's interconnection timeline, and the building's final inspection all depend on the solar scope being designed, permitted, installed, and documented in sequence. We treat it as a scheduled trade from day one.

Solar and the Certificate of Occupancy
Rooftop solar array being installed on a new mid-rise building during construction

Questions

Entertainment & Events solar, answered.

Are production studios required to install solar?

Studio campuses typically combine office, soundstage, and support occupancies. Office and assembly buildings carry the requirement; the treatment of soundstages depends on their classification and the 80% floor-area rule. We evaluate each building on a campus.

How does storage help a venue?

Venue loads concentrate into event windows that may fall outside solar production hours. A battery shifts daytime production into those windows and reduces demand charges that are often the largest item on a venue's utility bill.

Discuss Your Project

Planning entertainment & events in California?

Send us the drawings at any stage. We will size the Title 24 requirement, review the roof and electrical approach, and map the path to a Certificate of Occupancy that does not wait on solar.